Schematic Diagram Of The Installation Of Fluorocarbon Aluminum Veneer On The Outer Wall

Jul 01, 2020

Speaking of the outer wall fluorocarbon aluminum veneer, I believe you all should know it! Aluminum veneer is one of the most common building materials, and its application range is very wide. If you have a certain understanding of construction, Partners must be able to see it often, do you know the installation process of aluminum veneer? Do you want to know it? Next, we will introduce the installation schematic diagram of the outer wall fluorocarbon aluminum veneer, the installation of aluminum veneer Method and some details.

1. First carefully review the drawings, understand the designer's intention, understand the design of the panel number diagram, the installation structure large sample node diagram, if necessary, on-site re-measurement and check with the designer's drawings, on-site dimensions and drawings are There is no difference, it is also important to analyze the starting point of the installation.

2. Transport the aluminum plates and accessories to each construction site by vertical transportation equipment such as elevators.

3. Clean the indoor side of the fluorocarbon aluminum plate and the surface of the column frame with a cleaning agent.

4. The whole aluminum plate of the outer wall is connected to the keel through the aluminum corners (hanging ears) around it and fixed on the keel.

5. Fixing method, if it is seamless splicing inside, you can use electric drill to turn the hole at the corresponding position on the keel, and then rivet with flat head (counterhead) aluminum rivet; if it is a plate with glue seam outside, you can use steel to tail screws (also It is called flange screw or phoenix nail, see the figure) drilled directly into the keel through the connection hole of aluminum angle code to fix the aluminum plate, but pay attention to control the tightness of the drill bit to adjust the aluminum plate.

6. The aluminum veneer of the outer wall enters the field for trial assembly, first fix the aluminum plate on the keel slightly, pay attention to the installation precision control, and adjust the plate before tightening.

7. When installing aluminum plates, install them on the wall in sequence according to the aluminum plate numbers.

8. The installation of the outer wall fluorocarbon aluminum veneer starts from the front, large area and corner, and the principle of installation from top to bottom.

9. The connection between the outer wall fluorocarbon aluminum plate and the keel should meet the requirements of the drawings, be firm and reliable, and install bolts.

10. The corner of the curtain wall and the surrounding wall, the connection structure of the upper and lower seals, and the treatment of deformation joints should meet the design requirements.

11. Node structure and closing processing.

①Wall panel joints: Usually, the joints of the joints are prone to uneven top and bottom or unequal surface. Therefore, one side panel should be installed first, and the line should be positioned. The horizontal and vertical control lines should be used to determine the installation position of the other side panel. After the two sides of the board have reached the requirements, draw the nails in turn and install the pressure plate to fix it;

②The lower end of the wall is closed, and the water baffle is specially made according to the actual size. The lower end is sealed, and the gap between the board and the wall is covered at the same time to prevent the rain from seeping into the room.

12. When installing, pay attention to the gaps between the plates and the requirements of the interface of the panel.

13. After the installation of the aluminum veneer on the outer wall is completed, cover and protect it with plastic film or other materials in the parts that are easily contaminated.

Detail handling

1. The installation method of fluorocarbon aluminum veneer is to leave a seam with a uniform size between the boards, and then fill it with foam strips and sealants, which can effectively prevent the infiltration of rainwater, and can also prevent the thermal expansion and contraction of the aluminum veneer. Deformed. Aluminum veneer installation process flow: pay-off, fixed frame connection, fixed frame, aluminum veneer installation, closing structure processing, inspection.

2. The installation method of the fluorocarbon aluminum veneer in the outer wall is the close installation between the boards. There is only one natural seam in the vision. It is mostly used in indoor walls and ceilings. Its installation accuracy standard is higher than that of the outer wall installation. Therefore, it is necessary to ensure that the aluminum veneer is installed correctly. Aluminum veneer installation process flow: pay-off, fixed frame connection, fixed frame, installation of aluminum veneer, closing structure processing, inspection.

3. Dry-mounted installation of aluminum veneer According to the design drawings and the actual measured size on site, determine the installation position of the aluminum veneer support skeleton. Install the fixed frame connection. The position of fixing frame and installing frame should be accurate, and the combination should be firm.